Capital projects for the grid: schedule, budget, documents, one register

Substations, lines, generation and storage: budget, schedule and risk as the teams record them.

A project schedule in CiviTrac: the work-package grid beside the gantt, with the critical path, baselines and dependency links drawn.
A transmission interconnection's schedule: 110 work packages, 47 dependencies, the critical path in one colour.

Health that rolls up, and says why

Portfolio, program, project, work package: every level rolls up on its own, so a slip on one feeder tie-in shows in the portfolio view before it is a surprise in the field. Red, amber and green mean the same thing to a director as to the engineer who flagged it.

The CiviTrac overview: portfolio health bar, a map of project locations, budget position and the projects needing attention.